The Ringsend Wastewater Treatment Plant (WwTP), which provides over 40% of Ireland’s wastewater treatment capacity, is currently overloaded and is not in compliance with the EU’s Urban Wastewater Treatment Directive.
This major Ringsend Wastewater Treatment Plant Upgrade Project will allow the Ringsend WwTP to treat the increasing volumes of wastewater arriving at the plant to the required standard, enabling future housing and commercial development.
Laois Scaffolding Hire Ltd. are providing general and design access scaffolding services for the mechanical and electrical installation.
Info:
Category : Industrial
Date : June 2020 – on-going
Client : Suir Engineering
Location : Ringsend, Dublin