Share

Blog Parallax

Blog Parallax

Laois / Cairn – three year contract

01 Laois Scaffolding Hire Ltd. are delighted to have secured a three year contract with close clients Cairn homes. Layher
Read more

Tagging System: Inspect7®

The digital scaffolding inspection company SafeTime has launched brand new hardware for scaffolding inspections, the ‘Inspect7 Label’. The Inspect7 Label is a new passive inspection system from the London based company. The label works in the same way as their traditional inspection device Inspect7 but with no digital display. SafeTime say this will help their customers reduce hardware costs [...]
Read more

Dublin Landings comes to an end…

Vestibulum orci felis, ullamcorper non condimentum non, ultrices ac nunc. Mauris non ligula suscipit, vulputate mi accumsan, dapibus felis. Nullam sed sapien dui. Nulla auctor sit amet sem non porta. Integer iaculis tellus nulla, quis imperdiet magna venenatis vitae.

Read more

Catchfan Safety System

Laois Scaffolding Hire Ltd. have adopted the Vertemax Catchfan System, incorporating this innovative safety measure to their services for high rise projects. The Catchfan is designed to absorb the energy of falling objects, mitigating against objects causing danger to the public or damage to property. This is an excellent containment solution providing a greatly improved level [...]
Read more